°ÄÃÅÁùºÏ²Ê¸ßÊÖ

Subscribe options

Select your newsletters:

Please enter your email address:

@

Your email address will only be used for the purpose of sending you the °ÄÃÅÁùºÏ²Ê¸ßÊÖ Organization publication(s) that you have requested. °ÄÃÅÁùºÏ²Ê¸ßÊÖ Organization will not transfer your email address or other personal data to any other party or use it for commercial purposes.

If you change your mind, you can easily unsubscribe by clicking the unsubscribe option at the bottom of an email you've received from °ÄÃÅÁùºÏ²Ê¸ßÊÖ Organization.

For more information, see our Privacy policy.

News & Media

Latest °ÄÃÅÁùºÏ²Ê¸ßÊÖ Newsline

  • Fusion supply chain | A glimpse into the future for commercial fusion reactors

    Most of the USD 7 billion in investment in private fusion initiatives has gone to companies that are building devices from the ground up. But recently, another [...]

    Read more

  • Outreach | °ÄÃÅÁùºÏ²Ê¸ßÊÖ @ October science festivals

    Every October, before schools pause for two weeks of holiday, towns and cities in France open their municipal spaces to scientific experts of all stripes who ar [...]

    Read more

  • Image of the week | °ÄÃÅÁùºÏ²Ê¸ßÊÖ Director-General visits Russia

    The °ÄÃÅÁùºÏ²Ê¸ßÊÖ Director-General was in Russia last week, meeting with stakeholders and holding technical meetings with colleagues in Moscow and Saint Petersburg. As [...]

    Read more

  • Image of the Week | Sector 5 is on its way

    The first vacuum vessel sector produced in Europe travelled last week between Monfalcone, Italy, and the French port of Fos-sur-Mer. The 440-tonne component had [...]

    Read more

  • Anniversary | °ÄÃÅÁùºÏ²Ê¸ßÊÖ Document Management system turns 20

    Whatever its nature, every large project generates huge numbers of documents. And when project collaborators operate from different countries, as was the case f [...]

    Read more

Of Interest

See archived entries

What's happening behind the hill?

As work proceeds behind the hill on the east side of the worksite, the feeling is one of déjà vu: things look strangely familiar, as if time had rolled back to the years 2007-2008 when the °ÄÃÅÁùºÏ²Ê¸ßÊÖ platform was being levelled and readied for construction.

The two-hectare logistics platform will host the 9,000 m2 warehouse and an outdoor storage area. It is located on a stretch of land that was transferred from CEA to the °ÄÃÅÁùºÏ²Ê¸ßÊÖ Organization earlier this year. (Click to view larger version...)
The two-hectare logistics platform will host the 9,000 m2 warehouse and an outdoor storage area. It is located on a stretch of land that was transferred from CEA to the °ÄÃÅÁùºÏ²Ê¸ßÊÖ Organization earlier this year.
And indeed it is another platform that is taking shape, although on a much smaller scale. One that will support the 9,000 m² warehouse and outdoor holding area where average-size components will be stored, pending their integration into the machine.

Whereas the °ÄÃÅÁùºÏ²Ê¸ßÊÖ platform had to be levelled, the new logistics platform behind the hill has to be compacted, as it is formed from accumulated backfill (up to 30 metres in depth) from the °ÄÃÅÁùºÏ²Ê¸ßÊÖ construction site.

Compacting is a time-consuming and spectacular operation, achieved by repeatedly dropping, every 10 square metres or so, an 18-tonne steel mass from a height of 12 metres. As a consequence, the level of the platform will eventually be lowered by one to two metres.

Compacting is achieved by repeatedly dropping an 18-ton steel mass from a height of 12 metres. (Click to view larger version...)
Compacting is achieved by repeatedly dropping an 18-ton steel mass from a height of 12 metres.
Compacting operations will take about one month. Once finalized, soil pressure tests will be performed to confirm that the two-hectare platform presents the required bearing capacity to support the warehouse and outside storage area.

By the end of 2015, a climate controlled, steel-structure warehouse will be in place for component storage. Half of its surface will be used for mass storage; the other half will be equipped with racks (up to eight metres high) for pallet storage.

Components will reach the warehouse by way of the heavy-haul road build along the edge of the °ÄÃÅÁùºÏ²Ê¸ßÊÖ site, where they will be unpacked, stored, and sometimes pre-assembled within the warehouse.

The logistics platform is part of a ten-hectare parcel of land that was transferred from the CEA to the °ÄÃÅÁùºÏ²Ê¸ßÊÖ Organization earlier this year. Two hectares will be used by the European Domestic Agency to dispose of some 200,000 m3 of soil and rock resulting from the ongoing construction work on the °ÄÃÅÁùºÏ²Ê¸ßÊÖ platform.

The warehouse is a 150-metre long, 60-metre wide, 12-metre high conventional building that will accommodate non-HEL (Highly Exceptional Load) components. Compacting work began last week and will continue for approximately one month. (Click to view larger version...)
The warehouse is a 150-metre long, 60-metre wide, 12-metre high conventional building that will accommodate non-HEL (Highly Exceptional Load) components. Compacting work began last week and will continue for approximately one month.
 


return to the latest published articles