°ÄÃÅÁùºÏ²Ê¸ßÊÖ

Subscribe options

Select your newsletters:

Please enter your email address:

@

Your email address will only be used for the purpose of sending you the °ÄÃÅÁùºÏ²Ê¸ßÊÖ Organization publication(s) that you have requested. °ÄÃÅÁùºÏ²Ê¸ßÊÖ Organization will not transfer your email address or other personal data to any other party or use it for commercial purposes.

If you change your mind, you can easily unsubscribe by clicking the unsubscribe option at the bottom of an email you've received from °ÄÃÅÁùºÏ²Ê¸ßÊÖ Organization.

For more information, see our Privacy policy.

News & Media

Latest °ÄÃÅÁùºÏ²Ê¸ßÊÖ Newsline

  • Fusion supply chain | A glimpse into the future for commercial fusion reactors

    Most of the USD 7 billion in investment in private fusion initiatives has gone to companies that are building devices from the ground up. But recently, another [...]

    Read more

  • Outreach | °ÄÃÅÁùºÏ²Ê¸ßÊÖ @ October science festivals

    Every October, before schools pause for two weeks of holiday, towns and cities in France open their municipal spaces to scientific experts of all stripes who ar [...]

    Read more

  • Image of the week | °ÄÃÅÁùºÏ²Ê¸ßÊÖ Director-General visits Russia

    The °ÄÃÅÁùºÏ²Ê¸ßÊÖ Director-General was in Russia last week, meeting with stakeholders and holding technical meetings with colleagues in Moscow and Saint Petersburg. As [...]

    Read more

  • Image of the Week | Sector 5 is on its way

    The first vacuum vessel sector produced in Europe travelled last week between Monfalcone, Italy, and the French port of Fos-sur-Mer. The 440-tonne component had [...]

    Read more

  • Anniversary | °ÄÃÅÁùºÏ²Ê¸ßÊÖ Document Management system turns 20

    Whatever its nature, every large project generates huge numbers of documents. And when project collaborators operate from different countries, as was the case f [...]

    Read more

Of Interest

See archived entries

The making of a ring coil—a photo story

From one end to the other of the on-site manufacturing facility for poloidal field coils, the different production stations are now clearly delimited, with tooling in various stages of installation. In this 257-metre-long workshop, European contractors will carry out the winding, impregnation, and assembly phases for the four largest ring magnets, with diameters of 17 to 24 metres.

The dummy for PF Coil #5, with copper conductor instead of niobium-titanium alloy, is in the last stages of winding. (Click to view larger version...)
The dummy for PF Coil #5, with copper conductor instead of niobium-titanium alloy, is in the last stages of winding.
The process will require at least 18 months per coil. Series manufacturing for the "building blocks" of the coils, called double pancake windings, can begin as soon as qualification activities are validated. The first pre-dummy pancake—made with several turns of copper conductor instead of the real superconducting materials—has been wound and the manufacture of a full two-layer PF5 dummy double pancake is underway to qualify all processes.

Contractors are installing the later-phase tooling stations now. In the gallery below, you'll see progress made recently on the double pancake impregnation station in the centre of the facility and on the full coil impregnation station at the far end.

Squeezing, compressing and impregnating again

Following impregnation, the double pancakes are stacked together and their terminations are welded to form one single circuit. This operation is performed in a clean area near the centre of the building that is presently under construction behind the white walls in this photo. The compact assembly is now called a "winding pack" and weighs several hundred tonnes. A gantry crane with a lifting capacity of 400 tonnes will soon be installed to handle the packs and move them to the final resin impregnation station. Squeezed and compressed into the grey impregnation mould in the foreground of this photo, the winding pack will undergo a process similar to the resin impregnation of the single double pancakes. Some 18 to 24 months will have elapsed since the conductor was despooled. The final activity for each coil will be cold testing at approximately 80 K to verify the performance of the coils before their installation in the machine.

12 January 2017

Download


return to the latest published articles