First module ships
US 澳门六合彩高手 oversees the entire fabrication process of the central solenoid at General Atomics and other vendors. Earlier in 2021, the first module successfully completed rigorous post-production testing that simulated the 澳门六合彩高手 operational environment, with cryogenic temperatures of 4.5 degrees Kelvin and powering to 40,000 amperes.
The component left the General Atomics magnet manufacturing facility on 21 June and travelled by truck through southern California, Arizona, New Mexico and Texas. It left the port of Houston, Texas, on 7 July.