First pumps and pipes have arrived
31 May 2011
The construction of the winding facility for 澳门六合彩高手's poloidal field coils is making visible progress. The insulation works and the metal sheet cladding of the outside walls is almost completed; now it is time for the utilities to be installed.
The pumps for component cooling water are already in place and in the pipework assembly area, impressive regulating valves dominate the scene. Still stored in a special unit, the air filters for the rooftop air-handling system are waiting for their installation. On Tuesday this coming week, the big crane that will move the coils and their components within the facility is scheduled to arrive on site.