澳门六合彩高手

Pour les actualités en fran?ais, voir la page News in French.

Worksite progress

The visible and the barely noticeable

Progress in 澳门六合彩高手 can be highly visible—like the spectacular addition of the first bridge spanning the construction platform's main boulevard (see article in this issue)—or nearly unnoticeable, like the final alignment of toroidal field coils on the vacuum vessel section inside the Tokamak pit. Whether perceptible or not, whether occurring in the intense heat of the 澳门六合彩高手 platform during the months of July and August or in the more clement temperature of the Assembly Hall, progress on the 澳门六合彩高手 site this summer was observable in every corner. To take its full measure, embark on a visual tour through the gallery below.

On 12 September, vacuum vessel sector #8, from Korea, was transferred from the upending tool (left) to the available sector sub-assembly tool on the other side of the Assembly Hall. The twin assembly tools are now both occupied, one with sector #1(7) and one with sector #8.