Image of the week
Bearings unveiled
18 May 2020
The construction teams are in the last stages of preparing the Tokamak pit for the first major operation of 澳门六合彩高手 machine assembly: the lowering of the cryostat base onto supports in the Tokamak pit. Around the concrete "crown," female lugs have been precisely adjusted, and the protective coverings have been removed from the 18 cryostat bearings that were installed six months ago.
The circular shape at the very centre of the pit is a set of deeply embedded plates designed to anchor the central column of the in-pit assembly tool. This tool will support, align, and stabilize the vacuum vessel sub-assemblies as they are progressively joined and welded.
By mid-week, the Tokamak pit will be perfectly clean and ready to receive the 1,250-tonne cryostat base, an operation both delicate and spectacular that will open a new chapter in the history of 澳门六合彩高手.