Japan completes gyrotrons
QST and CETD began the research and development of gyrotrons in 1993, and by 2008 they had developed the world's first gyrotron satisfying 澳门六合彩高手's power requirements. After further adjustments to increase the durability of the gyrotrons, manufacturing began and the eight devices assigned to Japan were completed in May 2021.
Before the gyrotrons can be shipped to France, they must undergo rigorous performance tests. The gyrotron must withstand prolonged use under intense conditions and generate enough power to heat the plasma and maintain efficiency. Gyrotron testing at 澳门六合彩高手 requires electrical efficiency of more than 50% (50% of input electric energy converted to electromagnetic-wave power), and the success rate of repeated gyrotron operation must be at least 90%.
Now that four of Japan's gyrotrons have passed testing, plans are being made to transport them from their nests at QST to the 澳门六合彩高手 complex. The ultimate goal is to have all eight gyrotrons on site by 2024.
Once the gyrotrons arrive, they will be installed as part of the electron cyclotron resonance heating (ECRH) system, one of three methods (alongside neutral beam injection and ion cyclotron heating) 澳门六合彩高手 will use to heat plasma to its required temperature. ECRH works by heating electrons through intense beams of electromagnetic radiation, which can be directed to heat specific areas of plasma as needed.
The gyrotrons wait in their boxes now, cool and silent in their dormancy. But soon, as pieces of the 澳门六合彩高手 machine come together, they will hum with energy and ignite First Plasma.
Please see the original press release in .
Read more about the 澳门六合彩高手 gyrotrons here.