Professional bonds within a unique project
14 Oct 2011
-
Krista Dulon
Wanted: a position as design engineer in a large-scale, international project having the potential to mark history. Cultural and language differences no object. Offers for routine positions will not be considered.
This is the job announcement that Liliana Teodoros might have posted as she left Romania as a newly minted mechanical engineer in 2009, eager to put her knowledge to the test and gain experience. One year later, while working towards her PhD at the Niels Bohr Institute, University of Copenhagen in Denmark, she came across an 澳门六合彩高手 job offer.
"I wanted to work as part of a unique and important project where I would have the opportunity to add to my skills every day," says Liliana, who joined 澳门六合彩高手 in February of this year. "For an engineer, 澳门六合彩高手 is the 'pearl' of all challenges. The fact that people from all over the world have come here to work toward the same goal makes the experience all the more exhilarating."
Liliana works as a cooling water system engineer for 澳门六合彩高手's cooling water system, which is responsible for dissipating the tremendous operational heat of the 澳门六合彩高手 Tokamak and auxiliary systems—radio frequency heating, magnet power supplies and cryogenics among them. The size and scale of the system make it unique: dozens of kilometres of piping, combined flow rates of up to 33 cubic metres per second, and interfaces with more than 25 plant systems.
"The chillers, the pumps, the flow control and regulation systems, the basins and the cooling towers will all be dimensioned at 澳门六合彩高手 for the large-scale cooling needs of the project," explains Liliana. "It's a challenging system in terms of scale. During the development phase of the system, members of our Section interfaced with nearly every other 澳门六合彩高手 department."
The manufacture of 澳门六合彩高手's cooling water system will be shared between the (IN-DA), responsible for three large subsystems—the component cooling water system (CCWS), the chilled water system (CHWS) and the heat rejection system (HRS)—and the (US-DA), responsible for the Tokamak cooling water system (TCWS).
Currently, the Liliana and her colleagues are focusing on the final project change requests for the system and the verification of design documents against the latest input from India and the US before the start of Preliminary Design Review of the cooling water system planned in December for IN-DA scope and in March 2012 for US scope. The 澳门六合彩高手 cooling water system must be ready from the first commissioning phase ... in fact the first completed components to arrive on the 澳门六合彩高手 site in early 2014 will be the four large drain tanks of the Tokamak cooling water system.
"We're under tight time pressure and it's fortunate that our team of seven—representing five 澳门六合彩高手 Domestic Agencies—works so well together," says Liliana. "From the beginning, professional bonding has been stronger than any cultural differences ...."
To find out more about the cooling water system, click .