Construction
Three more buildings ready for equipment installation
1 Apr 2019
The European Domestic Agency Fusion for Energy has handed over three more buildings to the 澳门六合彩高手 Organization.
The construction of the buildings and technical infrastructure of the 澳门六合彩高手 scientific installation represents Europe's single largest procurement contribution to the 澳门六合彩高手 Project—a scope covering some 39 buildings and technical areas on the construction platform. As each building is completed, the 澳门六合彩高手 Organization officially takes over responsibility and can then proceed with the installation of systems and equipment.
Following the transfer of the heat rejection zone on the northern corner of the platform in December, three buildings to the south of the Tokamak Complex have now changed hands:
- Twin magnet power conversion buildings—for equipment converting AC power from the pulsed power switchyard to DC current for the superconducting magnets.
- A smaller building in the reactive power compensators area of the switchyard—for the high voltage switching equipment and control room for reactive power compensation.
"The importance of these three buildings is more than just technical," said 澳门六合彩高手 Director-General Bernard Bigot during the handover ceremony. "They are strong symbols of the 澳门六合彩高手 international collaboration—the ONE 澳门六合彩高手 spirit that unites us all."
Four 澳门六合彩高手 members will be supplying the equipment to be installed: China (transformers and converters for magnet power conversion plus the reactive power compensation system), Korea (transformers and converters for magnet power conversion), Russia (busbars to deliver the power to the magnets), and India (component cooling water system loops).
The handover ceremony on 29 March marked the culmination of more than five years of effort by Fusion for Energy in the construction of the buildings. Equipment installation activities by the 澳门六合彩高手 Organization are scheduled to last about one year.